Renovation Contractor in Kampong Pasir Ris
Compare local renovation contractor (hdb-registered) pros in Kampong Pasir Ris and get free quotes — no obligation, no call-backs you didn't ask for.
Typical price: SGD 27,600–SGD 138,000
Free, no obligation. Sign in with Google to send your request.
Renovation Contractor prices in Kampong Pasir Ris
| Job size | Low | Typical | High |
|---|---|---|---|
| 3-room HDB renovation Full renovation of a 3-room flat (~65 sqm) | SGD 27,600 | SGD 36,800 | SGD 50,600 |
| 4-room HDB renovation Full renovation of a 4-room flat (~93 sqm) | SGD 36,800 | SGD 50,600 | SGD 69,000 |
| 5-room HDB renovation Full renovation of a 5-room flat (~110 sqm) | SGD 46,000 | SGD 64,400 | SGD 87,400 |
| Condo whole-unit renovation Full renovation of a private condo unit | SGD 46,000 | SGD 82,800 | SGD 138,000 |
How to hire a renovation contractor pro in Singapore
- For an HDB flat, hire only a contractor listed in the HDB Directory of Renovation Contractors (DRC) — mandatory for HDB renovation work
- Confirm the contractor applies for the HDB renovation permit before hacking walls, replacing floor finishes, or doing wet works
- For condos, get MCST (management) approval and pay the renovation deposit before works start
- Prefer CaseTrust-accredited renovation firms — they carry deposit protection and standard contracts
- Get an itemized quote: carpentry priced per foot run, tiling and hacking per square foot/metre, with brands specified for fittings
- Check the schedule respects noise rules: noisy works in HDB blocks are weekdays 9am-5pm only, no work on Sundays and public holidays
HDB flats — where most Singaporeans live — can only be renovated by HDB-registered contractors under a renovation permit system, with strict rules on structural walls, floor loading, window works, and noisy-work hours. Private condos require MCST approval and deposits instead, and CaseTrust accreditation is the main consumer-protection signal for renovation firms.
Budgeting first?
See the full breakdown of what drives renovation contractor prices — job sizes, unit rates, and how to save.
Frequently asked questions
Do I need permits for my renovation in Kampong Pasir Ris?
Cosmetic work (painting, flooring, replacing fixtures in place) rarely needs a permit. Structural changes, wall removals, and significant plumbing or electrical alterations usually do, and rules in Kampong Pasir Ris follow your national and local building codes. Ask the contractor to name the specific approval needed and who applies for it — a contractor who suggests skipping permits is transferring the legal risk to you.
What questions should I ask before hiring a contractor in Kampong Pasir Ris?
Ask: who will actually be on site daily (the owner or a foreman), which parts are done by their own team versus subcontractors, how many projects they run at once, what their current lead time in Kampong Pasir Ris is, how they price variations, and what their warranty covers and for how long. The quality of the answers tells you as much as the answers themselves.
How many renovation quotes should I get in Kampong Pasir Ris?
Get at least three itemized quotes from contractors who have visited the property in Kampong Pasir Ris. Phone or photo-based estimates are fine for a ballpark, but only an in-person survey produces a quote a contractor will stand behind. Discard any quote that is dramatically below the others rather than celebrating it — it usually signals missed scope or planned extras later.
How long does a renovation take?
A single-room refresh typically takes 1-3 weeks, a kitchen or bathroom 2-6 weeks, and a whole-home renovation 2-6 months depending on structural work and approvals. Add lead time before the start date for permits, custom cabinetry, and contractor availability — good contractors are often booked 1-3 months out.
Can I live in my home during a renovation?
Usually yes for single-room projects if water and power stay connected to the rest of the home; usually no for whole-home work involving dust-heavy demolition or when the only kitchen or bathroom is out of service for weeks. Ask the contractor to phase the works so one bathroom stays functional, and budget for short-term accommodation on gut renovations.
How much does an HDB renovation cost in 2025?
Qanvast's 2025 data puts a 3-room BTO at roughly S$36,000-S$44,000, a 4-room at S$51,000-S$62,000, and a 5-room at S$67,000-S$82,000 for full renovations. Resale flats cost more than BTOs because of hacking and rectification of older finishes.
How long does an HDB renovation take?
Typical full renovations run 8-10 weeks for a 3-room flat and 10-12 weeks for a 5-room, plus permit approval time before starting. Noisy-works restrictions (weekdays 9am-5pm only) are a big reason timelines are longer than overseas equivalents.
Free, no obligation. Sign in with Google to send your request.
How Handld works
- 1
Tell us what you need
Describe the job and where you are. It takes about a minute.
- 2
We match your request
Your request goes to local professionals who cover your area and service.
- 3
Compare quotes and choose
Pros reply with quotes. Compare, ask questions and hire on your terms — free for you.
Renovation Contractor near Kampong Pasir Ris
- Renovation Contractor in Pasir Ris New Town
- Renovation Contractor in Tampines Estate
- Renovation Contractor in Kangkar
- Renovation Contractor in Tampines New Town
- Renovation Contractor in Matilda Estate
- Renovation Contractor in Serangoon
- Renovation Contractor in Sengkang New Town
- Renovation Contractor in Punggol
- Renovation Contractor in Simei New Town
- Renovation Contractor in Ulu Bedok
- Renovation Contractor in Hougang New Town
- Renovation Contractor in Kaki Bukit Estate