Renovation Contractor in Hougang New Town
Compare local renovation contractor (hdb-registered) pros in Hougang New Town and get free quotes — no obligation, no call-backs you didn't ask for.
Typical price: SGD 27,600–SGD 138,000
Free, no obligation. Sign in with Google to send your request.
Renovation Contractor prices in Hougang New Town
| Job size | Low | Typical | High |
|---|---|---|---|
| 3-room HDB renovation Full renovation of a 3-room flat (~65 sqm) | SGD 27,600 | SGD 36,800 | SGD 50,600 |
| 4-room HDB renovation Full renovation of a 4-room flat (~93 sqm) | SGD 36,800 | SGD 50,600 | SGD 69,000 |
| 5-room HDB renovation Full renovation of a 5-room flat (~110 sqm) | SGD 46,000 | SGD 64,400 | SGD 87,400 |
| Condo whole-unit renovation Full renovation of a private condo unit | SGD 46,000 | SGD 82,800 | SGD 138,000 |
How to hire a renovation contractor pro in Singapore
- For an HDB flat, hire only a contractor listed in the HDB Directory of Renovation Contractors (DRC) — mandatory for HDB renovation work
- Confirm the contractor applies for the HDB renovation permit before hacking walls, replacing floor finishes, or doing wet works
- For condos, get MCST (management) approval and pay the renovation deposit before works start
- Prefer CaseTrust-accredited renovation firms — they carry deposit protection and standard contracts
- Get an itemized quote: carpentry priced per foot run, tiling and hacking per square foot/metre, with brands specified for fittings
- Check the schedule respects noise rules: noisy works in HDB blocks are weekdays 9am-5pm only, no work on Sundays and public holidays
HDB flats — where most Singaporeans live — can only be renovated by HDB-registered contractors under a renovation permit system, with strict rules on structural walls, floor loading, window works, and noisy-work hours. Private condos require MCST approval and deposits instead, and CaseTrust accreditation is the main consumer-protection signal for renovation firms.
Budgeting first?
See the full breakdown of what drives renovation contractor prices — job sizes, unit rates, and how to save.
Frequently asked questions
Is it cheaper to renovate in stages or all at once?
One combined project is almost always cheaper per unit of work: a single mobilization, one round of demolition and dust protection, and better contractor pricing on a larger contract. Stage the work only if cash flow requires it, and sequence it so you never redo finished work — for example, complete all plumbing and electrical changes before any room gets its final finishes.
How much contingency should I budget?
Hold back 10-15% of the contract value for surprises on a standard renovation, and 20% for older properties where opening walls tends to reveal outdated wiring, corroded pipes, or damp. Do not tell the contractor your contingency figure — it is your buffer, not extra scope budget.
How much deposit is normal for a renovation?
For most markets 10% or less of the contract value is a reasonable deposit, sometimes up to 20-30% for jobs with heavy upfront material orders like custom cabinetry. Several countries cap deposits by law. Never pay a large share of the total before work starts, and never pay the full amount up front.
What does a renovation contractor actually do?
A renovation contractor (general contractor or main builder) manages your whole project: pricing the job, scheduling and supervising trades like electricians and plumbers, ordering materials, arranging permits where needed, and being the single party responsible for quality and timeline. You pay one contract price instead of coordinating five separate trades yourself.
What are variations (change orders) and how do I keep them under control?
A variation is any change to the agreed scope after signing — moving a wall, upgrading tiles, fixing a hidden problem. Insist every variation is priced and approved in writing before the work happens. Most renovation budget blowouts are not the original quote being wrong; they are dozens of verbally-approved variations nobody tracked.
How do renovation payment schedules work?
Payments should follow completed milestones, not calendar dates: for example deposit, completion of demolition and first-fix (rough-in), completion of second-fix and finishes, then a final payment of 5-10% held until the snag list (punch list) is closed. That final retention is your only real leverage for defect fixes.
How much does an HDB renovation cost in 2025?
Qanvast's 2025 data puts a 3-room BTO at roughly S$36,000-S$44,000, a 4-room at S$51,000-S$62,000, and a 5-room at S$67,000-S$82,000 for full renovations. Resale flats cost more than BTOs because of hacking and rectification of older finishes.
How long does an HDB renovation take?
Typical full renovations run 8-10 weeks for a 3-room flat and 10-12 weeks for a 5-room, plus permit approval time before starting. Noisy-works restrictions (weekdays 9am-5pm only) are a big reason timelines are longer than overseas equivalents.
Free, no obligation. Sign in with Google to send your request.
How Handld works
- 1
Tell us what you need
Describe the job and where you are. It takes about a minute.
- 2
We match your request
Your request goes to local professionals who cover your area and service.
- 3
Compare quotes and choose
Pros reply with quotes. Compare, ask questions and hire on your terms — free for you.
Renovation Contractor near Hougang New Town
- Renovation Contractor in Sengkang New Town
- Renovation Contractor in Ulu Bedok
- Renovation Contractor in Tampines Estate
- Renovation Contractor in Ang Mo Kio New Town
- Renovation Contractor in Bedok New Town
- Renovation Contractor in Tampines New Town
- Renovation Contractor in Punggol
- Renovation Contractor in Singapore
- Renovation Contractor in Yishun New Town
- Renovation Contractor in Bukit Batok New Town
- Renovation Contractor in Woodlands
- Renovation Contractor in Choa Chu Kang New Town