Handld.org

Renovation Contractor in Simei New Town

Compare local renovation contractor (hdb-registered) pros in Simei New Town and get free quotes — no obligation, no call-backs you didn't ask for.

Typical price: SGD 27,600–SGD 138,000

Get quotes from renovation contractor pros in Simei New Town — free, no obligation

Free, no obligation. Sign in with Google to send your request.

Renovation Contractor prices in Simei New Town

Researched estimates for Simei New Town (SGD), adjusted for city size from national ranges. Updated 2026.
Job size Low Typical High
3-room HDB renovation Full renovation of a 3-room flat (~65 sqm) SGD 27,600 SGD 36,800 SGD 50,600
4-room HDB renovation Full renovation of a 4-room flat (~93 sqm) SGD 36,800 SGD 50,600 SGD 69,000
5-room HDB renovation Full renovation of a 5-room flat (~110 sqm) SGD 46,000 SGD 64,400 SGD 87,400
Condo whole-unit renovation Full renovation of a private condo unit SGD 46,000 SGD 82,800 SGD 138,000

How to hire a renovation contractor pro in Singapore

  1. For an HDB flat, hire only a contractor listed in the HDB Directory of Renovation Contractors (DRC) — mandatory for HDB renovation work
  2. Confirm the contractor applies for the HDB renovation permit before hacking walls, replacing floor finishes, or doing wet works
  3. For condos, get MCST (management) approval and pay the renovation deposit before works start
  4. Prefer CaseTrust-accredited renovation firms — they carry deposit protection and standard contracts
  5. Get an itemized quote: carpentry priced per foot run, tiling and hacking per square foot/metre, with brands specified for fittings
  6. Check the schedule respects noise rules: noisy works in HDB blocks are weekdays 9am-5pm only, no work on Sundays and public holidays

HDB flats — where most Singaporeans live — can only be renovated by HDB-registered contractors under a renovation permit system, with strict rules on structural walls, floor loading, window works, and noisy-work hours. Private condos require MCST approval and deposits instead, and CaseTrust accreditation is the main consumer-protection signal for renovation firms.

Budgeting first?

See the full breakdown of what drives renovation contractor prices — job sizes, unit rates, and how to save.

Renovation Contractor cost guide for Singapore

Frequently asked questions

Should I hire a general contractor or manage the trades myself?

Manage trades yourself only if the job involves one or two trades and you can be on site regularly. Once a project needs sequencing (demolition, then rough plumbing and wiring, then walls, then finishes), a contractor typically saves more in avoided rework and delays than their 10-20% management margin costs.

What can I do if the work is defective or the contractor disappears?

Document defects in writing with photos, give the contractor a written chance to fix them within a set period, and withhold only the retention amount — not all payment — while they do. If they abandon the job, your remedies are your contract, any licensing body's complaint process, consumer protection agencies, and small claims court. This is why the paper trail and staged payments matter from day one.

What are variations (change orders) and how do I keep them under control?

A variation is any change to the agreed scope after signing — moving a wall, upgrading tiles, fixing a hidden problem. Insist every variation is priced and approved in writing before the work happens. Most renovation budget blowouts are not the original quote being wrong; they are dozens of verbally-approved variations nobody tracked.

Do I need permits for my renovation in Simei New Town?

Cosmetic work (painting, flooring, replacing fixtures in place) rarely needs a permit. Structural changes, wall removals, and significant plumbing or electrical alterations usually do, and rules in Simei New Town follow your national and local building codes. Ask the contractor to name the specific approval needed and who applies for it — a contractor who suggests skipping permits is transferring the legal risk to you.

How much does an HDB renovation cost in 2025?

Qanvast's 2025 data puts a 3-room BTO at roughly S$36,000-S$44,000, a 4-room at S$51,000-S$62,000, and a 5-room at S$67,000-S$82,000 for full renovations. Resale flats cost more than BTOs because of hacking and rectification of older finishes.

How long does an HDB renovation take?

Typical full renovations run 8-10 weeks for a 3-room flat and 10-12 weeks for a 5-room, plus permit approval time before starting. Noisy-works restrictions (weekdays 9am-5pm only) are a big reason timelines are longer than overseas equivalents.

Compare renovation contractor quotes in Simei New Town — free

Free, no obligation. Sign in with Google to send your request.

How Handld works

  1. 1

    Tell us what you need

    Describe the job and where you are. It takes about a minute.

  2. 2

    We match your request

    Your request goes to local professionals who cover your area and service.

  3. 3

    Compare quotes and choose

    Pros reply with quotes. Compare, ask questions and hire on your terms — free for you.

Renovation Contractor near Simei New Town

Related services in Simei New Town

Related cost guides