Bathroom Renovation in Kampong Pasir Ris
Compare local toilet / bathroom renovation pros in Kampong Pasir Ris and get free quotes — no obligation, no call-backs you didn't ask for.
Typical price: SGD 3,700–SGD 23,000
Free, no obligation. Sign in with Google to send your request.
Bathroom Renovation prices in Kampong Pasir Ris
| Job size | Low | Typical | High |
|---|---|---|---|
| Single HDB bathroom Hacking, retiling, waterproofing, new fixtures for one toilet | SGD 3,700 | SGD 6,450 | SGD 11,000 |
| Both HDB bathrooms Full renovation of two toilets in one project | SGD 7,350 | SGD 11,000 | SGD 16,600 |
| Condo master bathroom Full renovation with higher-spec fittings | SGD 7,350 | SGD 13,800 | SGD 23,000 |
How to hire a bathroom renovation pro in Singapore
- For HDB flats, use an HDB-registered renovation contractor and get the renovation permit before hacking wall or floor finishes
- Note the HDB rule: in new BTO flats, bathroom floor and wall finishes must not be hacked within the first 3 years (waterproofing warranty period)
- Confirm waterproofing redone to the full wet-area standard after any floor hacking, with a stated warranty
- Use a PUB-licensed plumber for water service and sanitary works
- Get quotes itemized per toilet: hacking, tiling per sq ft, plumbing points, fixtures, and glass shower screen
- Schedule noisy works within HDB hours (weekdays 9am-5pm) and budget the timeline accordingly
HDB regulates bathroom renovation tightly: only HDB-registered contractors may do the work under permit, new BTO bathrooms cannot have floor/wall finishes hacked within 3 years, and water and sanitary works need PUB-licensed plumbers. Condo renovations instead require MCST approval and deposits.
Budgeting first?
See the full breakdown of what drives bathroom renovation prices — job sizes, unit rates, and how to save.
Frequently asked questions
Do I supply the fittings myself or buy through the contractor?
Buying your own toilet, vanity, and taps gives price control; buying through the contractor makes them responsible for defects, wrong sizes, and delivery timing. A common middle path: contractor supplies everything built-in or warranty-critical (shower valves, waste, membrane), you supply visible items like mirrors and accessories. Whoever supplies an item owns replacing it if it arrives damaged.
What should I check at handover of a renovated bathroom?
Run every fixture: check drainage speed, look under the vanity for weeps, confirm the shower floor falls to the drain (pour a bucket and watch), check grout lines are even and silicone is continuous, and test the extractor fan. Photograph everything and get the waterproofing product and warranty terms in writing before releasing final payment.
Is tiling over existing tiles ever OK?
It can work on sound, well-bonded wall tiles and saves strip-out cost, but it fails on floors with movement, adds thickness that fouls doors and fittings, and hides the condition of the substrate and membrane. Most renovators strip back in wet areas — if a contractor proposes tile-over-tile in the shower zone specifically, treat it as a cost-cutting red flag.
How do I compare bathroom renovation quotes in Kampong Pasir Ris?
Make every quote in Kampong Pasir Ris state: strip-out and disposal, first-fix plumbing and electrical, waterproofing (product named), tiling with a per-square-metre rate and tile allowance, fittings supply (brands listed or marked as owner-supplied), and second-fix. The cheapest quote is usually the one missing a line — often waterproofing or disposal.
How much does an HDB toilet renovation cost?
A single HDB bathroom typically runs S$4,000-S$12,000 depending on whether floors are hacked and waterproofing redone; renovating both bathrooms together commonly lands around S$8,000-S$18,000. Condo master bathrooms run higher, S$8,000-S$25,000.
Why can't I renovate my new BTO bathroom immediately?
HDB prohibits hacking floor and wall finishes in new BTO bathrooms for 3 years to preserve the original waterproofing warranty. You can still change fixtures, vanities, and accessories in that window — full retiling has to wait or use approved overlay methods.
Free, no obligation. Sign in with Google to send your request.
How Handld works
- 1
Tell us what you need
Describe the job and where you are. It takes about a minute.
- 2
We match your request
Your request goes to local professionals who cover your area and service.
- 3
Compare quotes and choose
Pros reply with quotes. Compare, ask questions and hire on your terms — free for you.
Bathroom Renovation near Kampong Pasir Ris
- Bathroom Renovation in Pasir Ris New Town
- Bathroom Renovation in Tampines Estate
- Bathroom Renovation in Kangkar
- Bathroom Renovation in Tampines New Town
- Bathroom Renovation in Matilda Estate
- Bathroom Renovation in Serangoon
- Bathroom Renovation in Sengkang New Town
- Bathroom Renovation in Punggol
- Bathroom Renovation in Simei New Town
- Bathroom Renovation in Ulu Bedok
- Bathroom Renovation in Hougang New Town
- Bathroom Renovation in Kaki Bukit Estate