Bathroom Renovation in Toa Payoh New Town
Compare local toilet / bathroom renovation pros in Toa Payoh New Town and get free quotes — no obligation, no call-backs you didn't ask for.
Typical price: SGD 3,700–SGD 23,000
Free, no obligation. Sign in with Google to send your request.
Bathroom Renovation prices in Toa Payoh New Town
| Job size | Low | Typical | High |
|---|---|---|---|
| Single HDB bathroom Hacking, retiling, waterproofing, new fixtures for one toilet | SGD 3,700 | SGD 6,450 | SGD 11,000 |
| Both HDB bathrooms Full renovation of two toilets in one project | SGD 7,350 | SGD 11,000 | SGD 16,600 |
| Condo master bathroom Full renovation with higher-spec fittings | SGD 7,350 | SGD 13,800 | SGD 23,000 |
How to hire a bathroom renovation pro in Singapore
- For HDB flats, use an HDB-registered renovation contractor and get the renovation permit before hacking wall or floor finishes
- Note the HDB rule: in new BTO flats, bathroom floor and wall finishes must not be hacked within the first 3 years (waterproofing warranty period)
- Confirm waterproofing redone to the full wet-area standard after any floor hacking, with a stated warranty
- Use a PUB-licensed plumber for water service and sanitary works
- Get quotes itemized per toilet: hacking, tiling per sq ft, plumbing points, fixtures, and glass shower screen
- Schedule noisy works within HDB hours (weekdays 9am-5pm) and budget the timeline accordingly
HDB regulates bathroom renovation tightly: only HDB-registered contractors may do the work under permit, new BTO bathrooms cannot have floor/wall finishes hacked within 3 years, and water and sanitary works need PUB-licensed plumbers. Condo renovations instead require MCST approval and deposits.
Budgeting first?
See the full breakdown of what drives bathroom renovation prices — job sizes, unit rates, and how to save.
Frequently asked questions
Do I supply the fittings myself or buy through the contractor?
Buying your own toilet, vanity, and taps gives price control; buying through the contractor makes them responsible for defects, wrong sizes, and delivery timing. A common middle path: contractor supplies everything built-in or warranty-critical (shower valves, waste, membrane), you supply visible items like mirrors and accessories. Whoever supplies an item owns replacing it if it arrives damaged.
What is the correct order of works in a bathroom renovation?
Strip-out, then first-fix plumbing and electrics (pipes and cables in walls), then substrate preparation and waterproofing, then tiling, then second-fix (toilet, vanity, taps, shower screen, lights), then silicone and snagging. If a quote or schedule doesn't follow this order, question it — out-of-sequence work is how leaks and redone tiles happen.
Should I hire one bathroom fitter or separate trades?
A bathroom renovation touches plumbing, electrics, waterproofing, tiling, and carpentry. A bathroom specialist or small contractor who coordinates all of it is usually worth the margin unless you have renovation experience — sequencing errors between trades (tiler before the plumber finished rough-in, for example) are the classic self-managed failure.
What drives the cost of a bathroom renovation?
In rough order: whether you move plumbing (relocating the toilet or shower is the single biggest multiplier), the quality tier of tiles and fittings, bathroom size, waterproofing scope, and access (upper floors and apartment buildings cost more). Labour typically makes up 40-60% of the total, so a bigger bathroom does not scale cost linearly — fixture count matters more than floor area.
How much deposit should I pay a bathroom renovator?
Around 10-20% is normal, sometimes more where custom vanities or imported fittings must be ordered up front — in that case pay the supplier invoice share, not a round 50%. Hold 5-10% back until the room has been used for a week or two and the snag list (grout gaps, silicone, door alignment) is closed.
Do I need a permit to renovate a bathroom in Toa Payoh New Town?
A like-for-like refit usually needs no permit in Toa Payoh New Town, but moving drainage, altering walls, or adding a new bathroom typically does under your local building rules — and electrical and plumbing work must be done by qualified or licensed trades in most countries. Ask your contractor to name the specific approval needed; see the country checklist on this page for what applies where you live.
How much does an HDB toilet renovation cost?
A single HDB bathroom typically runs S$4,000-S$12,000 depending on whether floors are hacked and waterproofing redone; renovating both bathrooms together commonly lands around S$8,000-S$18,000. Condo master bathrooms run higher, S$8,000-S$25,000.
Why can't I renovate my new BTO bathroom immediately?
HDB prohibits hacking floor and wall finishes in new BTO bathrooms for 3 years to preserve the original waterproofing warranty. You can still change fixtures, vanities, and accessories in that window — full retiling has to wait or use approved overlay methods.
Free, no obligation. Sign in with Google to send your request.
How Handld works
- 1
Tell us what you need
Describe the job and where you are. It takes about a minute.
- 2
We match your request
Your request goes to local professionals who cover your area and service.
- 3
Compare quotes and choose
Pros reply with quotes. Compare, ask questions and hire on your terms — free for you.
Bathroom Renovation near Toa Payoh New Town
- Bathroom Renovation in Bishan New Town
- Bathroom Renovation in Kallang
- Bathroom Renovation in Novena
- Bathroom Renovation in Serangoon New Town
- Bathroom Renovation in Serangoon Garden
- Bathroom Renovation in Geylang
- Bathroom Renovation in Ang Mo Kio New Town
- Bathroom Renovation in Hougang New Town
- Bathroom Renovation in Singapore
- Bathroom Renovation in Eunos
- Bathroom Renovation in Serangoon
- Bathroom Renovation in Bukit Merah Estate