Handld.org

Bathroom Renovation in Eunos

Compare local toilet / bathroom renovation pros in Eunos and get free quotes — no obligation, no call-backs you didn't ask for.

Typical price: SGD 3,700–SGD 23,000

Get quotes from bathroom renovation pros in Eunos — free, no obligation

Free, no obligation. Sign in with Google to send your request.

Bathroom Renovation prices in Eunos

Researched estimates for Eunos (SGD), adjusted for city size from national ranges. Updated 2026.
Job size Low Typical High
Single HDB bathroom Hacking, retiling, waterproofing, new fixtures for one toilet SGD 3,700 SGD 6,450 SGD 11,000
Both HDB bathrooms Full renovation of two toilets in one project SGD 7,350 SGD 11,000 SGD 16,600
Condo master bathroom Full renovation with higher-spec fittings SGD 7,350 SGD 13,800 SGD 23,000

How to hire a bathroom renovation pro in Singapore

  1. For HDB flats, use an HDB-registered renovation contractor and get the renovation permit before hacking wall or floor finishes
  2. Note the HDB rule: in new BTO flats, bathroom floor and wall finishes must not be hacked within the first 3 years (waterproofing warranty period)
  3. Confirm waterproofing redone to the full wet-area standard after any floor hacking, with a stated warranty
  4. Use a PUB-licensed plumber for water service and sanitary works
  5. Get quotes itemized per toilet: hacking, tiling per sq ft, plumbing points, fixtures, and glass shower screen
  6. Schedule noisy works within HDB hours (weekdays 9am-5pm) and budget the timeline accordingly

HDB regulates bathroom renovation tightly: only HDB-registered contractors may do the work under permit, new BTO bathrooms cannot have floor/wall finishes hacked within 3 years, and water and sanitary works need PUB-licensed plumbers. Condo renovations instead require MCST approval and deposits.

Budgeting first?

See the full breakdown of what drives bathroom renovation prices — job sizes, unit rates, and how to save.

Bathroom Renovation cost guide for Singapore

Frequently asked questions

How long does a bathroom renovation take?

A straight swap-in-place refit takes about 1-2 weeks; a full renovation with new waterproofing, retiling, and any layout change takes 2-4 weeks. Add waiting time before the start for fixture delivery and trades scheduling — and note that waterproofing membranes need curing days you cannot compress.

What is the correct order of works in a bathroom renovation?

Strip-out, then first-fix plumbing and electrics (pipes and cables in walls), then substrate preparation and waterproofing, then tiling, then second-fix (toilet, vanity, taps, shower screen, lights), then silicone and snagging. If a quote or schedule doesn't follow this order, question it — out-of-sequence work is how leaks and redone tiles happen.

How much does moving the toilet or shower add?

Relocating a toilet means rerouting the soil pipe and adjusting floor levels; moving a shower means new drainage falls and full re-waterproofing. Either typically adds a meaningful share of the total budget and extra days of work. If your budget is tight, keeping the existing layout is the single most effective cost-saver.

How do I compare bathroom renovation quotes in Eunos?

Make every quote in Eunos state: strip-out and disposal, first-fix plumbing and electrical, waterproofing (product named), tiling with a per-square-metre rate and tile allowance, fittings supply (brands listed or marked as owner-supplied), and second-fix. The cheapest quote is usually the one missing a line — often waterproofing or disposal.

Should I hire one bathroom fitter or separate trades?

A bathroom renovation touches plumbing, electrics, waterproofing, tiling, and carpentry. A bathroom specialist or small contractor who coordinates all of it is usually worth the margin unless you have renovation experience — sequencing errors between trades (tiler before the plumber finished rough-in, for example) are the classic self-managed failure.

What should I check at handover of a renovated bathroom?

Run every fixture: check drainage speed, look under the vanity for weeps, confirm the shower floor falls to the drain (pour a bucket and watch), check grout lines are even and silicone is continuous, and test the extractor fan. Photograph everything and get the waterproofing product and warranty terms in writing before releasing final payment.

How much does an HDB toilet renovation cost?

A single HDB bathroom typically runs S$4,000-S$12,000 depending on whether floors are hacked and waterproofing redone; renovating both bathrooms together commonly lands around S$8,000-S$18,000. Condo master bathrooms run higher, S$8,000-S$25,000.

Why can't I renovate my new BTO bathroom immediately?

HDB prohibits hacking floor and wall finishes in new BTO bathrooms for 3 years to preserve the original waterproofing warranty. You can still change fixtures, vanities, and accessories in that window — full retiling has to wait or use approved overlay methods.

Compare bathroom renovation quotes in Eunos — free

Free, no obligation. Sign in with Google to send your request.

How Handld works

  1. 1

    Tell us what you need

    Describe the job and where you are. It takes about a minute.

  2. 2

    We match your request

    Your request goes to local professionals who cover your area and service.

  3. 3

    Compare quotes and choose

    Pros reply with quotes. Compare, ask questions and hire on your terms — free for you.

Bathroom Renovation near Eunos

Related services in Eunos

Related cost guides