Bathroom Renovation in Kallang
Compare local toilet / bathroom renovation pros in Kallang and get free quotes — no obligation, no call-backs you didn't ask for.
Typical price: SGD 3,700–SGD 23,000
Free, no obligation. Sign in with Google to send your request.
Bathroom Renovation prices in Kallang
| Job size | Low | Typical | High |
|---|---|---|---|
| Single HDB bathroom Hacking, retiling, waterproofing, new fixtures for one toilet | SGD 3,700 | SGD 6,450 | SGD 11,000 |
| Both HDB bathrooms Full renovation of two toilets in one project | SGD 7,350 | SGD 11,000 | SGD 16,600 |
| Condo master bathroom Full renovation with higher-spec fittings | SGD 7,350 | SGD 13,800 | SGD 23,000 |
How to hire a bathroom renovation pro in Singapore
- For HDB flats, use an HDB-registered renovation contractor and get the renovation permit before hacking wall or floor finishes
- Note the HDB rule: in new BTO flats, bathroom floor and wall finishes must not be hacked within the first 3 years (waterproofing warranty period)
- Confirm waterproofing redone to the full wet-area standard after any floor hacking, with a stated warranty
- Use a PUB-licensed plumber for water service and sanitary works
- Get quotes itemized per toilet: hacking, tiling per sq ft, plumbing points, fixtures, and glass shower screen
- Schedule noisy works within HDB hours (weekdays 9am-5pm) and budget the timeline accordingly
HDB regulates bathroom renovation tightly: only HDB-registered contractors may do the work under permit, new BTO bathrooms cannot have floor/wall finishes hacked within 3 years, and water and sanitary works need PUB-licensed plumbers. Condo renovations instead require MCST approval and deposits.
Budgeting first?
See the full breakdown of what drives bathroom renovation prices — job sizes, unit rates, and how to save.
Frequently asked questions
How much does moving the toilet or shower add?
Relocating a toilet means rerouting the soil pipe and adjusting floor levels; moving a shower means new drainage falls and full re-waterproofing. Either typically adds a meaningful share of the total budget and extra days of work. If your budget is tight, keeping the existing layout is the single most effective cost-saver.
What drives the cost of a bathroom renovation?
In rough order: whether you move plumbing (relocating the toilet or shower is the single biggest multiplier), the quality tier of tiles and fittings, bathroom size, waterproofing scope, and access (upper floors and apartment buildings cost more). Labour typically makes up 40-60% of the total, so a bigger bathroom does not scale cost linearly — fixture count matters more than floor area.
Is tiling over existing tiles ever OK?
It can work on sound, well-bonded wall tiles and saves strip-out cost, but it fails on floors with movement, adds thickness that fouls doors and fittings, and hides the condition of the substrate and membrane. Most renovators strip back in wet areas — if a contractor proposes tile-over-tile in the shower zone specifically, treat it as a cost-cutting red flag.
What is the correct order of works in a bathroom renovation?
Strip-out, then first-fix plumbing and electrics (pipes and cables in walls), then substrate preparation and waterproofing, then tiling, then second-fix (toilet, vanity, taps, shower screen, lights), then silicone and snagging. If a quote or schedule doesn't follow this order, question it — out-of-sequence work is how leaks and redone tiles happen.
How do I keep bathroom renovation costs down without regretting it?
Keep the existing layout, choose mid-range fittings from stocked lines rather than special orders, use large-format tiles only on feature areas, and paint rather than tile ceilings and upper walls. Do not economize on waterproofing, drainage falls, or the tiler's labour — those are the items whose failure costs multiples later.
How much does an HDB toilet renovation cost?
A single HDB bathroom typically runs S$4,000-S$12,000 depending on whether floors are hacked and waterproofing redone; renovating both bathrooms together commonly lands around S$8,000-S$18,000. Condo master bathrooms run higher, S$8,000-S$25,000.
Why can't I renovate my new BTO bathroom immediately?
HDB prohibits hacking floor and wall finishes in new BTO bathrooms for 3 years to preserve the original waterproofing warranty. You can still change fixtures, vanities, and accessories in that window — full retiling has to wait or use approved overlay methods.
Free, no obligation. Sign in with Google to send your request.
How Handld works
- 1
Tell us what you need
Describe the job and where you are. It takes about a minute.
- 2
We match your request
Your request goes to local professionals who cover your area and service.
- 3
Compare quotes and choose
Pros reply with quotes. Compare, ask questions and hire on your terms — free for you.
Bathroom Renovation near Kallang
- Bathroom Renovation in Toa Payoh New Town
- Bathroom Renovation in Serangoon New Town
- Bathroom Renovation in Geylang
- Bathroom Renovation in Bishan New Town
- Bathroom Renovation in Novena
- Bathroom Renovation in Serangoon Garden
- Bathroom Renovation in Eunos
- Bathroom Renovation in Hougang New Town
- Bathroom Renovation in Serangoon
- Bathroom Renovation in Kaki Bukit Estate
- Bathroom Renovation in Kembangan
- Bathroom Renovation in Singapore