Handld.org

Bathroom Renovation in Serangoon Garden

Compare local toilet / bathroom renovation pros in Serangoon Garden and get free quotes — no obligation, no call-backs you didn't ask for.

Typical price: SGD 3,700–SGD 23,000

Get quotes from bathroom renovation pros in Serangoon Garden — free, no obligation

Free, no obligation. Sign in with Google to send your request.

Bathroom Renovation prices in Serangoon Garden

Researched estimates for Serangoon Garden (SGD), adjusted for city size from national ranges. Updated 2026.
Job size Low Typical High
Single HDB bathroom Hacking, retiling, waterproofing, new fixtures for one toilet SGD 3,700 SGD 6,450 SGD 11,000
Both HDB bathrooms Full renovation of two toilets in one project SGD 7,350 SGD 11,000 SGD 16,600
Condo master bathroom Full renovation with higher-spec fittings SGD 7,350 SGD 13,800 SGD 23,000

How to hire a bathroom renovation pro in Singapore

  1. For HDB flats, use an HDB-registered renovation contractor and get the renovation permit before hacking wall or floor finishes
  2. Note the HDB rule: in new BTO flats, bathroom floor and wall finishes must not be hacked within the first 3 years (waterproofing warranty period)
  3. Confirm waterproofing redone to the full wet-area standard after any floor hacking, with a stated warranty
  4. Use a PUB-licensed plumber for water service and sanitary works
  5. Get quotes itemized per toilet: hacking, tiling per sq ft, plumbing points, fixtures, and glass shower screen
  6. Schedule noisy works within HDB hours (weekdays 9am-5pm) and budget the timeline accordingly

HDB regulates bathroom renovation tightly: only HDB-registered contractors may do the work under permit, new BTO bathrooms cannot have floor/wall finishes hacked within 3 years, and water and sanitary works need PUB-licensed plumbers. Condo renovations instead require MCST approval and deposits.

Budgeting first?

See the full breakdown of what drives bathroom renovation prices — job sizes, unit rates, and how to save.

Bathroom Renovation cost guide for Singapore

Frequently asked questions

Should I hire one bathroom fitter or separate trades?

A bathroom renovation touches plumbing, electrics, waterproofing, tiling, and carpentry. A bathroom specialist or small contractor who coordinates all of it is usually worth the margin unless you have renovation experience — sequencing errors between trades (tiler before the plumber finished rough-in, for example) are the classic self-managed failure.

What is the correct order of works in a bathroom renovation?

Strip-out, then first-fix plumbing and electrics (pipes and cables in walls), then substrate preparation and waterproofing, then tiling, then second-fix (toilet, vanity, taps, shower screen, lights), then silicone and snagging. If a quote or schedule doesn't follow this order, question it — out-of-sequence work is how leaks and redone tiles happen.

Do I supply the fittings myself or buy through the contractor?

Buying your own toilet, vanity, and taps gives price control; buying through the contractor makes them responsible for defects, wrong sizes, and delivery timing. A common middle path: contractor supplies everything built-in or warranty-critical (shower valves, waste, membrane), you supply visible items like mirrors and accessories. Whoever supplies an item owns replacing it if it arrives damaged.

Do I need waterproofing, and can I skip redoing it?

If the renovation strips the shower area back to the substrate, waterproofing must be redone — a failed membrane is the most expensive bathroom defect there is, because the fix means demolishing finished tiling. Several countries regulate wet-area waterproofing explicitly. Never let a contractor tile directly over an old or damaged membrane.

How much does an HDB toilet renovation cost?

A single HDB bathroom typically runs S$4,000-S$12,000 depending on whether floors are hacked and waterproofing redone; renovating both bathrooms together commonly lands around S$8,000-S$18,000. Condo master bathrooms run higher, S$8,000-S$25,000.

Why can't I renovate my new BTO bathroom immediately?

HDB prohibits hacking floor and wall finishes in new BTO bathrooms for 3 years to preserve the original waterproofing warranty. You can still change fixtures, vanities, and accessories in that window — full retiling has to wait or use approved overlay methods.

Compare bathroom renovation quotes in Serangoon Garden — free

Free, no obligation. Sign in with Google to send your request.

How Handld works

  1. 1

    Tell us what you need

    Describe the job and where you are. It takes about a minute.

  2. 2

    We match your request

    Your request goes to local professionals who cover your area and service.

  3. 3

    Compare quotes and choose

    Pros reply with quotes. Compare, ask questions and hire on your terms — free for you.

Bathroom Renovation near Serangoon Garden

Related services in Serangoon Garden

Related cost guides