Handld.org

Renovation Contractor in Jurong West

Compare local renovation contractor (hdb-registered) pros in Jurong West and get free quotes — no obligation, no call-backs you didn't ask for.

Typical price: SGD 30,000–SGD 150,000

Get quotes from renovation contractor pros in Jurong West — free, no obligation

Free, no obligation. Sign in with Google to send your request.

Renovation Contractor prices in Jurong West

Researched estimates for Jurong West (SGD), adjusted for city size from national ranges. Updated 2026.
Job size Low Typical High
3-room HDB renovation Full renovation of a 3-room flat (~65 sqm) SGD 30,000 SGD 40,000 SGD 55,000
4-room HDB renovation Full renovation of a 4-room flat (~93 sqm) SGD 40,000 SGD 55,000 SGD 75,000
5-room HDB renovation Full renovation of a 5-room flat (~110 sqm) SGD 50,000 SGD 70,000 SGD 95,000
Condo whole-unit renovation Full renovation of a private condo unit SGD 50,000 SGD 90,000 SGD 150,000

How to hire a renovation contractor pro in Singapore

  1. For an HDB flat, hire only a contractor listed in the HDB Directory of Renovation Contractors (DRC) — mandatory for HDB renovation work
  2. Confirm the contractor applies for the HDB renovation permit before hacking walls, replacing floor finishes, or doing wet works
  3. For condos, get MCST (management) approval and pay the renovation deposit before works start
  4. Prefer CaseTrust-accredited renovation firms — they carry deposit protection and standard contracts
  5. Get an itemized quote: carpentry priced per foot run, tiling and hacking per square foot/metre, with brands specified for fittings
  6. Check the schedule respects noise rules: noisy works in HDB blocks are weekdays 9am-5pm only, no work on Sundays and public holidays

HDB flats — where most Singaporeans live — can only be renovated by HDB-registered contractors under a renovation permit system, with strict rules on structural walls, floor loading, window works, and noisy-work hours. Private condos require MCST approval and deposits instead, and CaseTrust accreditation is the main consumer-protection signal for renovation firms.

Budgeting first?

See the full breakdown of what drives renovation contractor prices — job sizes, unit rates, and how to save.

Renovation Contractor cost guide for Singapore

Frequently asked questions

How do I compare renovation quotes properly?

Ask every contractor to break the quote into the same line items: demolition, structural, plumbing, electrical, walls and finishes, fixtures, and a stated allowance for materials you choose. Then compare line by line. A single lump-sum number cannot be compared and cannot be enforced when scope questions come up mid-project.

How many renovation quotes should I get in Jurong West?

Get at least three itemized quotes from contractors who have visited the property in Jurong West. Phone or photo-based estimates are fine for a ballpark, but only an in-person survey produces a quote a contractor will stand behind. Discard any quote that is dramatically below the others rather than celebrating it — it usually signals missed scope or planned extras later.

Should I hire a general contractor or manage the trades myself?

Manage trades yourself only if the job involves one or two trades and you can be on site regularly. Once a project needs sequencing (demolition, then rough plumbing and wiring, then walls, then finishes), a contractor typically saves more in avoided rework and delays than their 10-20% management margin costs.

What does a renovation contractor actually do?

A renovation contractor (general contractor or main builder) manages your whole project: pricing the job, scheduling and supervising trades like electricians and plumbers, ordering materials, arranging permits where needed, and being the single party responsible for quality and timeline. You pay one contract price instead of coordinating five separate trades yourself.

How much does an HDB renovation cost in 2025?

Qanvast's 2025 data puts a 3-room BTO at roughly S$36,000-S$44,000, a 4-room at S$51,000-S$62,000, and a 5-room at S$67,000-S$82,000 for full renovations. Resale flats cost more than BTOs because of hacking and rectification of older finishes.

How long does an HDB renovation take?

Typical full renovations run 8-10 weeks for a 3-room flat and 10-12 weeks for a 5-room, plus permit approval time before starting. Noisy-works restrictions (weekdays 9am-5pm only) are a big reason timelines are longer than overseas equivalents.

Compare renovation contractor quotes in Jurong West — free

Free, no obligation. Sign in with Google to send your request.

How Handld works

  1. 1

    Tell us what you need

    Describe the job and where you are. It takes about a minute.

  2. 2

    We match your request

    Your request goes to local professionals who cover your area and service.

  3. 3

    Compare quotes and choose

    Pros reply with quotes. Compare, ask questions and hire on your terms — free for you.

Renovation Contractor near Jurong West

Related services in Jurong West

Related cost guides