Typical price: SGD 27,600–SGD 138,000

Get quotes from renovation contractor pros in Bukit Timah — free, no obligation

Free, no obligation. Sign in with Google to send your request.

Renovation Contractor prices in Bukit Timah

Researched estimates for Bukit Timah (SGD), adjusted for city size from national ranges. Updated 2026.
Job size Low Typical High
3-room HDB renovation Full renovation of a 3-room flat (~65 sqm) SGD 27,600 SGD 36,800 SGD 50,600
4-room HDB renovation Full renovation of a 4-room flat (~93 sqm) SGD 36,800 SGD 50,600 SGD 69,000
5-room HDB renovation Full renovation of a 5-room flat (~110 sqm) SGD 46,000 SGD 64,400 SGD 87,400
Condo whole-unit renovation Full renovation of a private condo unit SGD 46,000 SGD 82,800 SGD 138,000

How to hire a renovation contractor pro in Singapore

  1. For an HDB flat, hire only a contractor listed in the HDB Directory of Renovation Contractors (DRC) — mandatory for HDB renovation work
  2. Confirm the contractor applies for the HDB renovation permit before hacking walls, replacing floor finishes, or doing wet works
  3. For condos, get MCST (management) approval and pay the renovation deposit before works start
  4. Prefer CaseTrust-accredited renovation firms — they carry deposit protection and standard contracts
  5. Get an itemized quote: carpentry priced per foot run, tiling and hacking per square foot/metre, with brands specified for fittings
  6. Check the schedule respects noise rules: noisy works in HDB blocks are weekdays 9am-5pm only, no work on Sundays and public holidays

HDB flats — where most Singaporeans live — can only be renovated by HDB-registered contractors under a renovation permit system, with strict rules on structural walls, floor loading, window works, and noisy-work hours. Private condos require MCST approval and deposits instead, and CaseTrust accreditation is the main consumer-protection signal for renovation firms.

Budgeting first?

See the full breakdown of what drives renovation contractor prices — job sizes, unit rates, and how to save.

Renovation Contractor cost guide for Singapore

Frequently asked questions

What questions should I ask before hiring a contractor in Bukit Timah?

Ask: who will actually be on site daily (the owner or a foreman), which parts are done by their own team versus subcontractors, how many projects they run at once, what their current lead time in Bukit Timah is, how they price variations, and what their warranty covers and for how long. The quality of the answers tells you as much as the answers themselves.

How much contingency should I budget?

Hold back 10-15% of the contract value for surprises on a standard renovation, and 20% for older properties where opening walls tends to reveal outdated wiring, corroded pipes, or damp. Do not tell the contractor your contingency figure — it is your buffer, not extra scope budget.

How long does a renovation take?

A single-room refresh typically takes 1-3 weeks, a kitchen or bathroom 2-6 weeks, and a whole-home renovation 2-6 months depending on structural work and approvals. Add lead time before the start date for permits, custom cabinetry, and contractor availability — good contractors are often booked 1-3 months out.

What should be in a renovation contract?

At minimum: full scope of works, itemized price, start and completion dates, payment schedule tied to milestones, who obtains permits, how variations are priced and approved in writing, warranty terms, and how disputes are handled. If a contractor resists putting these in writing, that is the answer to whether you should hire them.

How much does an HDB renovation cost in 2025?

Qanvast's 2025 data puts a 3-room BTO at roughly S$36,000-S$44,000, a 4-room at S$51,000-S$62,000, and a 5-room at S$67,000-S$82,000 for full renovations. Resale flats cost more than BTOs because of hacking and rectification of older finishes.

How long does an HDB renovation take?

Typical full renovations run 8-10 weeks for a 3-room flat and 10-12 weeks for a 5-room, plus permit approval time before starting. Noisy-works restrictions (weekdays 9am-5pm only) are a big reason timelines are longer than overseas equivalents.

Compare renovation contractor quotes in Bukit Timah — free

Free, no obligation. Sign in with Google to send your request.

How Handld works

  1. 1

    Tell us what you need

    Describe the job and where you are. It takes about a minute.

  2. 2

    We match your request

    Your request goes to local professionals who cover your area and service.

  3. 3

    Compare quotes and choose

    Pros reply with quotes. Compare, ask questions and hire on your terms — free for you.

Renovation Contractor near Bukit Timah

Related services in Bukit Timah

Related cost guides