Handld.org

Kitchen Renovation in Jurong Town

Compare local kitchen renovation / carpentry package pros in Jurong Town and get free quotes — no obligation, no call-backs you didn't ask for.

Typical price: SGD 5,500–SGD 45,000

Get quotes from kitchen renovation pros in Jurong Town — free, no obligation

Free, no obligation. Sign in with Google to send your request.

Kitchen Renovation prices in Jurong Town

Researched estimates for Jurong Town (SGD), adjusted for city size from national ranges. Updated 2026.
Job size Low Typical High
Cabinet package only New kitchen carpentry, existing layout and finishes kept SGD 5,500 SGD 8,000 SGD 12,000
Full HDB kitchen renovation Hacking, tiling, carpentry, plumbing, and electrical SGD 11,000 SGD 16,000 SGD 25,000
Condo kitchen renovation Full renovation with premium finishes and appliances SGD 15,000 SGD 25,000 SGD 45,000

How to hire a kitchen renovation pro in Singapore

  1. For HDB flats, use an HDB-registered contractor and get the renovation permit before hacking walls or floor finishes
  2. Check HDB rules for your plan: open-kitchen conversions in BTOs must use approved partition treatments, and gas pipe relocation must be done by City Energy-authorized workers
  3. Get carpentry quoted per foot run (top and bottom cabinets separately) with the material and finish system named — it's the dominant cost line
  4. Confirm a PUB-licensed plumber for water/sanitary changes and an EMA-licensed electrician for circuits
  5. Confirm waterproofing renewal if kitchen floor tiles are hacked
  6. Schedule noisy works within HDB hours (weekdays 9am-5pm) and sequence around the 2-3 week carpentry manufacturing lead

HDB kitchen renovations require registered contractors under permit, with structural walls, floor loading, and gas relocations tightly controlled — gas work must be done by authorized gas service workers. Carpentry is priced per foot run in Singapore, which makes quotes unusually comparable if you insist on the breakdown.

Budgeting first?

See the full breakdown of what drives kitchen renovation prices — job sizes, unit rates, and how to save.

Kitchen Renovation cost guide for Singapore

Frequently asked questions

How long does a kitchen renovation take?

On-site work for a straightforward same-layout kitchen runs 2-4 weeks; layout changes with plumbing, gas, or electrical rework push it to 4-8 weeks. The hidden timeline is before day one: custom cabinetry commonly has 4-10 week manufacturing lead times, so order early and only demolish once delivery is confirmed.

How do I live without a kitchen during the renovation?

Set up a temporary station before demolition: microwave, kettle, and a portable induction hob near a sink you can still use (bathroom or laundry). Keep the old fridge running in another room. Budget realistically for more takeaway meals across the 2-6 kitchen-less weeks — it belongs in the project budget alongside tiles.

Flat-pack, semi-custom, or fully custom cabinets?

Flat-pack (IKEA-type) is the budget floor and works well in standard-shaped rooms with a good installer. Semi-custom modular ranges fit most kitchens at mid price. Fully custom joinery costs a large premium and earns it only for awkward spaces, non-standard heights, or specific design goals. The door and drawer hardware quality matters more to daily life than the box construction.

What contingency should I hold for a kitchen renovation?

Hold 10-15% beyond the quote. The classic surprises are behind the old kitchen: degraded wiring that fails modern load requirements, corroded pipework, out-of-level floors that complicate cabinet installation, and walls that need replastering once tiles come off. Older properties justify the top of the range.

Who should I hire — a kitchen company, a general contractor, or separate trades?

Kitchen companies bundle design, cabinetry, and installation — convenient, mid-to-premium pricing, but their trades coordination varies. A general contractor suits kitchens with structural or layout changes. Buying cabinets yourself and hiring an installer plus plumber and electrician is cheapest but makes you the project manager. Match the model to how much rework your kitchen needs, not to the showroom experience.

How much does an HDB kitchen renovation cost?

Kitchen cabinet packages start around S$5,500-S$8,000, while a complete HDB kitchen renovation (hacking, tiling, carpentry, plumbing, electrical) typically runs S$11,000-S$25,000. Condo kitchens with premium finishes run S$15,000-S$45,000.

Can I convert my HDB kitchen to an open kitchen?

Often yes with an HDB permit — non-structural walls can be removed, but structural walls cannot, and newer BTO open-kitchen conversions must follow HDB's approved schemes. Gas point relocation adds cost and must be done by authorized gas workers, so get that quoted before committing to the layout.

Compare kitchen renovation quotes in Jurong Town — free

Free, no obligation. Sign in with Google to send your request.

How Handld works

  1. 1

    Tell us what you need

    Describe the job and where you are. It takes about a minute.

  2. 2

    We match your request

    Your request goes to local professionals who cover your area and service.

  3. 3

    Compare quotes and choose

    Pros reply with quotes. Compare, ask questions and hire on your terms — free for you.

Kitchen Renovation near Jurong Town

Related services in Jurong Town

Related cost guides