Typical price: ₱2,750–₱276,000
Free, no obligation. Sign in with Google to send your request.
Roofing prices in Apalit
| Job size | Low | Typical | High |
|---|---|---|---|
| Leak / sheet repair Replace damaged sheets, reseal fasteners and flashings | ₱2,750 | ₱7,350 | ₱23,000 |
| Partial re-roof Replace one section of sheeting | ₱27,600 | ₱55,200 | ₱110,400 |
| Full re-roof (~100 m²) Strip and replace with pre-painted GI sheets | ₱73,600 | ₱138,000 | ₱276,000 |
How to hire a roofing pro in Philippines
- Schedule work in the dry season (roughly December-May), before typhoon season
- Specify the metal sheet gauge/thickness and coating (pre-painted GI is standard) in writing — thin sheets fail in typhoons
- Ask for wind-rated fastening details (screw type and spacing), not just 'yero installation'
- Building permits apply to structural work under the National Building Code; large contracts need PCAB-licensed contractors
- For labour-only arrangements, agree the per-m² labour rate and who buys materials
- Get a written scope with schedule and staged payments
Typhoon exposure makes wind-rated fastening and adequate sheet gauge the critical specification items in Philippine roofing. Building permits are required for structural work under the National Building Code, and larger contracts require PCAB-licensed contractors, though small repairs are commonly informal labour-only jobs.
Budgeting first?
See the full breakdown of what drives roofing prices — job sizes, unit rates, and how to save.
Frequently asked questions
What is flashing and why do most leaks start there?
Flashing is the metal detailing that seals joints — around chimneys, valleys, vents, skylights and wall junctions. These joints move and collect water flow, so flashing fails long before the main covering. If a roofer proposes reusing old flashing on a full replacement, push back.
Should I repair my roof or replace it?
Repair when damage is localised — a few slipped tiles, one flashing leak — and the roof is under about two-thirds of its expected life. Replace when leaks recur in different places, more than roughly 30% of the covering is failing, or repair quotes start approaching a third of replacement cost. A good roofer will show you photos from the roof to justify either answer.
Can a new roof be installed over the old one?
Sometimes — an overlay saves tear-off cost but hides deck problems, adds weight, and often shortens the new roof's life and warranty. Many codes and manufacturers limit roofs to two layers. Tear-off costs more upfront and is usually the better long-term decision; get both options priced.
Why do roofing quotes vary so much?
Access and safety costs (scaffolding, edge protection), roof pitch and height, tear-off vs overlay, material grade, and how honestly hidden deck repair is priced. A low bid that excludes safety equipment and deck contingency isn't cheaper — it's just billed later.
How do I find a reliable roofer in Apalit?
Get at least three quotes from established local firms in Apalit, ask each for recent local references and proof of insurance, and check membership of the national roofing trade body where one exists. Prioritise roofers who inspect from the roof (or with a drone) and show photos, over anyone quoting from the ground or the kerb.
How long does a roof replacement take?
A straightforward single-family roof takes 1-3 days for asphalt shingles or metal sheeting, and up to 1-2 weeks for tile, slate or complex multi-plane roofs. Weather delays are normal — a competent crew will never strip more roof than they can waterproof the same day.
How much does roofing cost in the Philippines?
Re-roofing with pre-painted GI sheets typically runs ₱800-₱2,600 per m² for materials plus labour, with labour alone at ₱150-₱500 per m². A full re-roof of a 100 m² home commonly lands at ₱80,000-₱300,000 depending on gauge, insulation and structure.
When should I schedule roof work in the Philippines?
In the dry months, roughly December to May. Typhoon season (June-November) both causes the damage and makes repair scheduling unreliable — and post-typhoon demand spikes push prices up and quality down. Pre-season inspection is the cheap option.
Free, no obligation. Sign in with Google to send your request.
How Handld works
- 1
Tell us what you need
Describe the job and where you are. It takes about a minute.
- 2
We match your request
Your request goes to local professionals who cover your area and service.
- 3
Compare quotes and choose
Pros reply with quotes. Compare, ask questions and hire on your terms — free for you.