How much does roofing cost in Philippines?
Free, no obligation. Sign in with Google to send your request.
Key takeaways
- Most roofing jobs in Philippines land between ₱3,000–₱300,000 — known locally as roofing contractor.
- Typhoon exposure makes wind-rated fastening and adequate sheet gauge the critical specification items in Philippine roofing. Building permits are required for structural work under the National Building Code, and larger contracts require PCAB-licensed contractors, though small repairs are commonly informal labour-only jobs.
- Prices below are researched national ranges, updated July 2026 — not quotes.
Roofing prices by job size in Philippines
| Job size | Low | Typical | High |
|---|---|---|---|
| Leak / sheet repair Replace damaged sheets, reseal fasteners and flashings | ₱3,000 | ₱8,000 | ₱25,000 |
| Partial re-roof Replace one section of sheeting | ₱30,000 | ₱60,000 | ₱120,000 |
| Full re-roof (~100 m²) Strip and replace with pre-painted GI sheets | ₱80,000 | ₱150,000 | ₱300,000 |
Per-unit rates
| Unit | Low | Typical | High |
|---|---|---|---|
| per m², re-roof labour only | ₱150 | ₱300 | ₱500 |
| per m², re-roof materials + labour | ₱800 | ₱1,500 | ₱2,600 |
What affects the price
- Job size and scope — bigger or more complex jobs move you up the ranges above.
- Access and condition — hard-to-reach areas, older properties or neglected maintenance add labour time.
- Materials and quality level — where materials are involved, the grade you choose often matters more than labour.
- Urgency — same-day or out-of-hours work usually carries a premium.
- Where you live — large metros in Philippines typically run above the national range; smaller towns below it.
How to save
- Get at least three quotes and compare like-for-like scopes, not just totals.
- Be flexible on timing — off-peak slots are often cheaper.
- Bundle related tasks into one visit to spread call-out costs.
- Agree the scope in writing up front to avoid change-order surprises.
How to hire a roofing pro in Philippines
- Schedule work in the dry season (roughly December-May), before typhoon season
- Specify the metal sheet gauge/thickness and coating (pre-painted GI is standard) in writing — thin sheets fail in typhoons
- Ask for wind-rated fastening details (screw type and spacing), not just 'yero installation'
- Building permits apply to structural work under the National Building Code; large contracts need PCAB-licensed contractors
- For labour-only arrangements, agree the per-m² labour rate and who buys materials
- Get a written scope with schedule and staged payments
Red flags
- Unspecified or suspiciously thin sheet gauge
- No fastening/wind-load details in a typhoon belt
- Full payment before materials are delivered
- Verbal-only contracts on a full re-roof
- Contractors with no completed local references
How Handld researches prices
These are researched estimates, not quotes and not our transaction data. We compile ranges from published sources — national statistics, trade bodies and incumbent cost guides — normalise them to PHP, and adjust city pages by a population-based cost tier. Last updated July 2026. Basis: Extrapolated from Philippine construction labour rates and regional metal-roofing material costs.
Frequently asked questions
What should be included in a roofing quote?
Tear-off and disposal, underlayment spec, flashing replacement (not reuse), ridge and valley details, a unit price for replacing rotten decking discovered mid-job, scaffolding or edge protection, and cleanup with a magnetic nail sweep. A quote missing the deck-repair unit price is the classic setup for large mid-job extras.
When is the best time of year to replace a roof?
Dry, settled weather — and before your region's storm or rainy season, not after it starts. Roofers book out weeks or months ahead of peak season, so schedule inspections early; shoulder-season slots are often cheaper and easier to get.
Can a new roof be installed over the old one?
Sometimes — an overlay saves tear-off cost but hides deck problems, adds weight, and often shortens the new roof's life and warranty. Many codes and manufacturers limit roofs to two layers. Tear-off costs more upfront and is usually the better long-term decision; get both options priced.
Will insurance pay for my roof?
Policies generally cover sudden storm damage (wind, hail, fallen trees) but not gradual wear and age. Document damage with dated photos immediately, get an independent assessment before signing anything a door-knocking contractor puts in front of you, and check whether your policy pays replacement cost or depreciated value on older roofs.
What are the warning signs I need roof work?
Missing, cracked or slipped tiles/shingles; granules collecting in gutters; daylight visible in the attic; damp patches or staining on top-floor ceilings; sagging roof lines; and moss holding moisture against the surface. Catching these early usually means a repair instead of a replacement.
How much does roofing cost in the Philippines?
Re-roofing with pre-painted GI sheets typically runs ₱800-₱2,600 per m² for materials plus labour, with labour alone at ₱150-₱500 per m². A full re-roof of a 100 m² home commonly lands at ₱80,000-₱300,000 depending on gauge, insulation and structure.
When should I schedule roof work in the Philippines?
In the dry months, roughly December to May. Typhoon season (June-November) both causes the damage and makes repair scheduling unreliable — and post-typhoon demand spikes push prices up and quality down. Pre-season inspection is the cheap option.
Free, no obligation. Sign in with Google to send your request.