Roofing in Roxas City
Compare local roofing contractor pros in Roxas City and get free quotes — no obligation, no call-backs you didn't ask for.
Typical price: ₱2,750–₱276,000
Free, no obligation. Sign in with Google to send your request.
Roofing prices in Roxas City
| Job size | Low | Typical | High |
|---|---|---|---|
| Leak / sheet repair Replace damaged sheets, reseal fasteners and flashings | ₱2,750 | ₱7,350 | ₱23,000 |
| Partial re-roof Replace one section of sheeting | ₱27,600 | ₱55,200 | ₱110,400 |
| Full re-roof (~100 m²) Strip and replace with pre-painted GI sheets | ₱73,600 | ₱138,000 | ₱276,000 |
How to hire a roofing pro in Philippines
- Schedule work in the dry season (roughly December-May), before typhoon season
- Specify the metal sheet gauge/thickness and coating (pre-painted GI is standard) in writing — thin sheets fail in typhoons
- Ask for wind-rated fastening details (screw type and spacing), not just 'yero installation'
- Building permits apply to structural work under the National Building Code; large contracts need PCAB-licensed contractors
- For labour-only arrangements, agree the per-m² labour rate and who buys materials
- Get a written scope with schedule and staged payments
Typhoon exposure makes wind-rated fastening and adequate sheet gauge the critical specification items in Philippine roofing. Building permits are required for structural work under the National Building Code, and larger contracts require PCAB-licensed contractors, though small repairs are commonly informal labour-only jobs.
Budgeting first?
See the full breakdown of what drives roofing prices — job sizes, unit rates, and how to save.
Frequently asked questions
How long does a roof last?
Typical service lives: asphalt shingles 15-30 years, concrete tile 40-60, clay tile and slate 60-100+, metal 40-70, flat membranes (felt, EPDM, TPO) 15-30. Underlayment and flashings usually fail before the covering itself, which is why old roofs leak even with intact tiles.
Should I repair my roof or replace it?
Repair when damage is localised — a few slipped tiles, one flashing leak — and the roof is under about two-thirds of its expected life. Replace when leaks recur in different places, more than roughly 30% of the covering is failing, or repair quotes start approaching a third of replacement cost. A good roofer will show you photos from the roof to justify either answer.
How much does a new roof cost?
It scales with roof area, pitch, number of storeys, access, and material. Basic asphalt shingle or concrete tile sits at the bottom of the range; metal, slate and clay cost two to four times more. Tear-off of the old covering, disposal, scaffolding or edge protection, and hidden deck repairs are the lines that move a quote most — make sure all four are priced before comparing.
Should gutters be replaced at the same time as the roof?
Often worth it: the access equipment is already up, edge details integrate cleanly, and combined pricing beats two separate jobs. If your gutters are under ten years old and sound, keep them — but have the roofer protect them during tear-off and note their condition in writing.
How do I find a reliable roofer in Roxas City?
Get at least three quotes from established local firms in Roxas City, ask each for recent local references and proof of insurance, and check membership of the national roofing trade body where one exists. Prioritise roofers who inspect from the roof (or with a drone) and show photos, over anyone quoting from the ground or the kerb.
How much deposit should a roofer ask for?
Typically 10-30%, or enough to cover ordered materials, with the balance staged against progress and completion. Never pay in full upfront, and be wary of anyone who can start 'tomorrow' if you pay cash today — good roofers have lead times.
How much does roofing cost in the Philippines?
Re-roofing with pre-painted GI sheets typically runs ₱800-₱2,600 per m² for materials plus labour, with labour alone at ₱150-₱500 per m². A full re-roof of a 100 m² home commonly lands at ₱80,000-₱300,000 depending on gauge, insulation and structure.
When should I schedule roof work in the Philippines?
In the dry months, roughly December to May. Typhoon season (June-November) both causes the damage and makes repair scheduling unreliable — and post-typhoon demand spikes push prices up and quality down. Pre-season inspection is the cheap option.
Free, no obligation. Sign in with Google to send your request.
How Handld works
- 1
Tell us what you need
Describe the job and where you are. It takes about a minute.
- 2
We match your request
Your request goes to local professionals who cover your area and service.
- 3
Compare quotes and choose
Pros reply with quotes. Compare, ask questions and hire on your terms — free for you.