Roofing in Seri Kembangan
Compare local roofing contractor pros in Seri Kembangan and get free quotes — no obligation, no call-backs you didn't ask for.
Typical price: MYR 280–MYR 78,200
Free, no obligation. Sign in with Google to send your request.
Roofing prices in Seri Kembangan
| Job size | Low | Typical | High |
|---|---|---|---|
| Leak repair Trace and fix flashing, valley or sheet leaks | MYR 280 | MYR 740 | MYR 2,300 |
| Partial re-roof Replace one section of covering | MYR 7,350 | MYR 13,800 | MYR 27,600 |
| Full re-roof Strip and replace terrace/semi-D roof | MYR 23,000 | MYR 41,400 | MYR 78,200 |
How to hire a roofing pro in Malaysia
- Book ahead of the year-end monsoon (November-March on the east coast; inter-monsoon storms elsewhere)
- For larger works use CIDB-registered contractors; structural changes need local-authority approval and plans
- Specify covering type (metal deck vs concrete tile) and underlayment in writing
- Get leak-tracing included — many 'roof leaks' are flashing or valley failures, not the covering
- Confirm debris disposal and site cleanup in the quote
- Get workmanship and material warranties in writing
Structural roof changes require local-authority approval and plans in Malaysia; like-for-like repairs typically don't, and established contractors register with CIDB. Monsoon seasons drive demand — repairs booked ahead of the year-end rains are cheaper and better executed than emergency work after.
Budgeting first?
See the full breakdown of what drives roofing prices — job sizes, unit rates, and how to save.
Frequently asked questions
What warranties should a new roof come with?
Two separate ones: a manufacturer warranty on materials (often 20-50 years, sometimes conditional on certified installation) and the contractor's own workmanship warranty (5-10 years is respectable). Get both in writing and understand what voids them — foot traffic, unventilated attics and pressure washing are common exclusions.
What should be included in a roofing quote?
Tear-off and disposal, underlayment spec, flashing replacement (not reuse), ridge and valley details, a unit price for replacing rotten decking discovered mid-job, scaffolding or edge protection, and cleanup with a magnetic nail sweep. A quote missing the deck-repair unit price is the classic setup for large mid-job extras.
When is the best time of year to replace a roof?
Dry, settled weather — and before your region's storm or rainy season, not after it starts. Roofers book out weeks or months ahead of peak season, so schedule inspections early; shoulder-season slots are often cheaper and easier to get.
Can a new roof be installed over the old one?
Sometimes — an overlay saves tear-off cost but hides deck problems, adds weight, and often shortens the new roof's life and warranty. Many codes and manufacturers limit roofs to two layers. Tear-off costs more upfront and is usually the better long-term decision; get both options priced.
How much do roof repairs cost in Malaysia?
Common leak repairs run RM300-RM2,500 depending on access and cause, while re-roofing runs roughly RM15-RM45 per square foot. A full re-roof of a terrace or semi-D typically lands at RM25,000-RM85,000.
Metal deck or concrete tile for Malaysian roofs?
Metal deck is lighter, faster to install and cheaper, but noisier in heavy rain and hotter without insulation; concrete tile costs more upfront and needs stronger structure but insulates and lasts longer. For monsoon rain, the installation quality of flashings and laps matters more than the covering choice.
Free, no obligation. Sign in with Google to send your request.
How Handld works
- 1
Tell us what you need
Describe the job and where you are. It takes about a minute.
- 2
We match your request
Your request goes to local professionals who cover your area and service.
- 3
Compare quotes and choose
Pros reply with quotes. Compare, ask questions and hire on your terms — free for you.