Handld.org

Renovation Contractor in Brighton

Compare local builder / main contractor pros in Brighton and get free quotes — no obligation, no call-backs you didn't ask for.

Typical price: £3,000–£150,000

Get quotes from renovation contractor pros in Brighton — free, no obligation

Free, no obligation. Sign in with Google to send your request.

Renovation Contractor prices in Brighton

Researched estimates for Brighton (GBP), adjusted for city size from national ranges. Updated 2026.
Job size Low Typical High
Single-room refresh Replastering, flooring, decoration, and fixture swaps in one room £3,000 £7,000 £15,000
Kitchen or bathroom renovation Full refit of one wet room through a main contractor £6,000 £12,000 £25,000
Multi-room renovation Several rooms including some rewiring or plumbing alterations £15,000 £35,000 £70,000
Whole-house refurbishment Full internal refurbishment of a 3-bed house £40,000 £75,000 £150,000

How to hire a renovation contractor pro in United Kingdom

  1. Check TrustMark registration or Federation of Master Builders (FMB) membership, and read recent reviews on Checkatrade or MyBuilder
  2. Agree the Building Regulations route before work starts — via local authority Building Control or an approved inspector; competent-person schemes can self-certify some work
  3. Confirm any gas work will be done by a Gas Safe registered engineer and electrical work by a Part P registered electrician
  4. Visit or call two recent local jobs as references
  5. Use a written contract (a JCT Home Owner contract is the standard template) with staged payments tied to milestones
  6. Ask for proof of public liability insurance of at least £2 million

The UK has no general builder's licence — anyone can trade as a builder — so verification falls on scheme memberships (TrustMark, FMB) and mandatory rules for specific trades: Gas Safe registration for gas and Part P compliance for domestic electrics. Structural alterations need Building Regulations approval, and non-compliance surfaces at sale time via missing completion certificates.

Budgeting first?

See the full breakdown of what drives renovation contractor prices — job sizes, unit rates, and how to save.

Renovation Contractor cost guide for United Kingdom

Frequently asked questions

What are variations (change orders) and how do I keep them under control?

A variation is any change to the agreed scope after signing — moving a wall, upgrading tiles, fixing a hidden problem. Insist every variation is priced and approved in writing before the work happens. Most renovation budget blowouts are not the original quote being wrong; they are dozens of verbally-approved variations nobody tracked.

How do renovation payment schedules work?

Payments should follow completed milestones, not calendar dates: for example deposit, completion of demolition and first-fix (rough-in), completion of second-fix and finishes, then a final payment of 5-10% held until the snag list (punch list) is closed. That final retention is your only real leverage for defect fixes.

Should I hire a general contractor or manage the trades myself?

Manage trades yourself only if the job involves one or two trades and you can be on site regularly. Once a project needs sequencing (demolition, then rough plumbing and wiring, then walls, then finishes), a contractor typically saves more in avoided rework and delays than their 10-20% management margin costs.

Can I live in my home during a renovation?

Usually yes for single-room projects if water and power stay connected to the rest of the home; usually no for whole-home work involving dust-heavy demolition or when the only kitchen or bathroom is out of service for weeks. Ask the contractor to phase the works so one bathroom stays functional, and budget for short-term accommodation on gut renovations.

How long does a renovation take?

A single-room refresh typically takes 1-3 weeks, a kitchen or bathroom 2-6 weeks, and a whole-home renovation 2-6 months depending on structural work and approvals. Add lead time before the start date for permits, custom cabinetry, and contractor availability — good contractors are often booked 1-3 months out.

What does a builder charge per day in the UK?

General builder day rates typically run £200-£320 per day outside London and £300-£450 in London and the South East. Most renovation work is quoted as a fixed project price rather than day rate — Checkatrade cost guides put a full house refurbishment at roughly £800-£2,500 per square metre depending on spec.

Do I need planning permission or just Building Regulations?

They are separate systems. Most internal renovations need no planning permission, but structural work, new drainage, electrics, and replacement windows must comply with Building Regulations and get signed off. Extensions and external changes may need planning permission too — check with your local authority before committing to a design.

Compare renovation contractor quotes in Brighton — free

Free, no obligation. Sign in with Google to send your request.

How Handld works

  1. 1

    Tell us what you need

    Describe the job and where you are. It takes about a minute.

  2. 2

    We match your request

    Your request goes to local professionals who cover your area and service.

  3. 3

    Compare quotes and choose

    Pros reply with quotes. Compare, ask questions and hire on your terms — free for you.

Renovation Contractor near Brighton

Related services in Brighton

Related cost guides