Handld.org

Bathroom Renovation in Nottingham

Compare local bathroom fitting / new bathroom pros in Nottingham and get free quotes — no obligation, no call-backs you didn't ask for.

Typical price: £2,000–£20,000

Get quotes from bathroom renovation pros in Nottingham — free, no obligation

Free, no obligation. Sign in with Google to send your request.

Bathroom Renovation prices in Nottingham

Researched estimates for Nottingham (GBP), adjusted for city size from national ranges. Updated 2026.
Job size Low Typical High
Budget refresh New suite fitted in the existing layout, minimal tiling £2,000 £3,500 £5,000
Standard full refit Strip-out, new suite, full retile, new flooring £5,500 £7,000 £8,500
Large/high-end bathroom Layout changes, premium sanitaryware, underfloor heating £10,000 £14,000 £20,000

How to hire a bathroom renovation pro in United Kingdom

  1. Check reviews and past work on Checkatrade or MyBuilder, and ask for two recent local installs to contact
  2. Confirm any new circuits or electric showers are installed by a Part P registered electrician who can self-certify
  3. If a gas combi boiler or gas water heating is affected, use a Gas Safe registered engineer
  4. Notify Building Control if drainage is altered or a new bathroom is created — like-for-like refits don't need it
  5. Get an itemized quote separating strip-out, first fix, tiling (per m² with tile allowance), and sanitaryware supply
  6. Agree staged payments with 5-10% retained until snagging is complete

The UK requires Part P compliance for bathroom electrical work (new circuits, electric showers) via a registered electrician or Building Control, and Building Regulations approval when drainage is altered or a new bathroom is formed. There is no licence for bathroom fitters themselves, so scheme memberships and references carry the weight.

Budgeting first?

See the full breakdown of what drives bathroom renovation prices — job sizes, unit rates, and how to save.

Bathroom Renovation cost guide for United Kingdom

Frequently asked questions

Do I need a permit to renovate a bathroom in Nottingham?

A like-for-like refit usually needs no permit in Nottingham, but moving drainage, altering walls, or adding a new bathroom typically does under your local building rules — and electrical and plumbing work must be done by qualified or licensed trades in most countries. Ask your contractor to name the specific approval needed; see the country checklist on this page for what applies where you live.

Do I supply the fittings myself or buy through the contractor?

Buying your own toilet, vanity, and taps gives price control; buying through the contractor makes them responsible for defects, wrong sizes, and delivery timing. A common middle path: contractor supplies everything built-in or warranty-critical (shower valves, waste, membrane), you supply visible items like mirrors and accessories. Whoever supplies an item owns replacing it if it arrives damaged.

Walk-in shower or bathtub — what should I choose?

Walk-in showers cost less to build than bath-plus-screen setups, use less space, and suit ageing-in-place. Keep at least one bathtub in the home if you may sell to families — in most markets a home with no bath at all narrows the buyer pool. If you have two bathrooms, the common answer is one of each.

How long does a bathroom renovation take?

A straight swap-in-place refit takes about 1-2 weeks; a full renovation with new waterproofing, retiling, and any layout change takes 2-4 weeks. Add waiting time before the start for fixture delivery and trades scheduling — and note that waterproofing membranes need curing days you cannot compress.

What is the correct order of works in a bathroom renovation?

Strip-out, then first-fix plumbing and electrics (pipes and cables in walls), then substrate preparation and waterproofing, then tiling, then second-fix (toilet, vanity, taps, shower screen, lights), then silicone and snagging. If a quote or schedule doesn't follow this order, question it — out-of-sequence work is how leaks and redone tiles happen.

How much does a new bathroom cost in the UK?

Checkatrade's 2025-26 guide puts a new bathroom including materials at £5,500-£8,000 with an average around £7,000; budget refits can come in near £3,000-£4,500 and large or high-end bathrooms run £14,000+. Fitting labour alone is typically £1,500-£4,000 depending on scope.

How long does a UK bathroom refit take?

A straightforward refit takes about 5-10 working days; layout changes or first-floor drainage rework push it to two to three weeks. Book fitters ahead — good bathroom installers in most UK cities carry 4-8 week lead times.

Compare bathroom renovation quotes in Nottingham — free

Free, no obligation. Sign in with Google to send your request.

How Handld works

  1. 1

    Tell us what you need

    Describe the job and where you are. It takes about a minute.

  2. 2

    We match your request

    Your request goes to local professionals who cover your area and service.

  3. 3

    Compare quotes and choose

    Pros reply with quotes. Compare, ask questions and hire on your terms — free for you.

Bathroom Renovation near Nottingham

Related services in Nottingham

Related cost guides