Kitchen Renovation in Sungai Buloh
Compare local kitchen renovation / kabinet dapur pros in Sungai Buloh and get free quotes — no obligation, no call-backs you didn't ask for.
Typical price: MYR 7,350–MYR 92,000
Free, no obligation. Sign in with Google to send your request.
Kitchen Renovation prices in Sungai Buloh
| Job size | Low | Typical | High |
|---|---|---|---|
| Cabinet package New kitchen cabinets and worktop, existing layout | MYR 7,350 | MYR 11,000 | MYR 16,600 |
| Full kitchen renovation Hacking, tiling, cabinets, plumbing, and electrical | MYR 16,600 | MYR 27,600 | MYR 41,400 |
| Premium renovation / extension Wet-kitchen extension or premium custom kitchen | MYR 41,400 | MYR 64,400 | MYR 92,000 |
How to hire a kitchen renovation pro in Malaysia
- Get kitchen cabinets quoted per foot run with the material system named (melamine, laminate, spray paint, aluminium) — it's the dominant cost line
- Confirm a Suruhanjaya Tenaga-registered electrician for new circuits and a qualified installer for gas piping
- For condos, get JMB/MC approval, pay the renovation deposit, and observe permitted hours
- For landed homes, check whether a wet-kitchen extension needs a PBT permit with plans — the classic Malaysian kitchen extension does
- Confirm waterproofing if floor tiles are hacked in a wet kitchen
- Keep the deposit to 10-30% with milestone payments
Malaysian kitchen renovations trigger council (PBT) permits when extensions are involved — the popular wet-kitchen extension on landed homes is the standard case — and strata properties need JMB/MC approval. Cabinetry is priced per foot run, and electrical work must use Suruhanjaya Tenaga-registered electricians.
Budgeting first?
See the full breakdown of what drives kitchen renovation prices — job sizes, unit rates, and how to save.
Frequently asked questions
Should I supply appliances myself or through the contractor?
Appliances are the easiest item to self-supply because they are standardized and heavily discounted in sales — just lock in exact models before cabinets are ordered, since cabinet openings are built to them. Let the contractor handle anything built-in that affects warranty or gas/electrical certification, and agree in writing who is responsible if a self-supplied appliance arrives late or damaged.
Do I need a permit for a kitchen renovation in Sungai Buloh?
Replacing cabinets and appliances in place rarely needs a permit in Sungai Buloh. Moving gas lines, altering drainage, removing walls, or adding circuits usually does, under your local building rules — and gas and electrical work must be done by licensed or registered trades in most countries. Ask the contractor to name the exact approval and who obtains it.
Is it worth just refacing cabinets instead of a full renovation?
If the cabinet carcasses are sound and you like the layout, replacing doors, drawer fronts, hardware, and the benchtop delivers most of the visual change for roughly a third to half the cost of a full renovation. It is not worth it when carcasses are water-damaged, the layout fails you daily, or services need rework anyway — then you'd pay twice.
In what order does a kitchen renovation happen?
Design and cabinet order first (longest lead time), then strip-out, then first-fix plumbing, gas, and electrical, then walls, ceilings, and flooring, then cabinet installation, then benchtop templating and fitting (often a 1-2 week gap for stone), then appliances, splashback, and second-fix. The benchtop templating gap surprises most first-timers — plan interim use around it.
How much does a kitchen renovation cost in Malaysia?
Kitchen cabinet packages run roughly RM8,000-RM18,000 (about RM250-RM600 per foot run depending on materials), while full kitchen renovations typically land RM15,000-RM50,000 and premium projects RM45,000-RM100,000. Wet-kitchen extensions on landed homes add structural and permit costs on top.
What is a wet kitchen versus dry kitchen in Malaysian renovation?
Malaysian homes commonly split heavy cooking (wet kitchen, often an extension at the back) from light prep and display (dry kitchen). Renovating a dry kitchen is mostly cabinetry work; building or extending a wet kitchen involves structure, roofing, and drainage — meaning PBT-approved plans and roughly double the per-square-foot cost.
Free, no obligation. Sign in with Google to send your request.
How Handld works
- 1
Tell us what you need
Describe the job and where you are. It takes about a minute.
- 2
We match your request
Your request goes to local professionals who cover your area and service.
- 3
Compare quotes and choose
Pros reply with quotes. Compare, ask questions and hire on your terms — free for you.
Kitchen Renovation near Sungai Buloh
- Kitchen Renovation in Bukit Rahman Putra
- Kitchen Renovation in Damansara Damai
- Kitchen Renovation in Kota Damansara
- Kitchen Renovation in Kampung Baru Subang
- Kitchen Renovation in Kepong
- Kitchen Renovation in Bandar Utama
- Kitchen Renovation in Taman Petaling
- Kitchen Renovation in Rawang
- Kitchen Renovation in Petaling Jaya
- Kitchen Renovation in Selayang Baru Utara
- Kitchen Renovation in Bandar Tasik Puteri
- Kitchen Renovation in Batu Caves