Kitchen Renovation in George Town
Compare local kitchen renovation / kabinet dapur pros in George Town and get free quotes — no obligation, no call-backs you didn't ask for.
Typical price: MYR 7,350–MYR 92,000
Free, no obligation. Sign in with Google to send your request.
Kitchen Renovation prices in George Town
| Job size | Low | Typical | High |
|---|---|---|---|
| Cabinet package New kitchen cabinets and worktop, existing layout | MYR 7,350 | MYR 11,000 | MYR 16,600 |
| Full kitchen renovation Hacking, tiling, cabinets, plumbing, and electrical | MYR 16,600 | MYR 27,600 | MYR 41,400 |
| Premium renovation / extension Wet-kitchen extension or premium custom kitchen | MYR 41,400 | MYR 64,400 | MYR 92,000 |
How to hire a kitchen renovation pro in Malaysia
- Get kitchen cabinets quoted per foot run with the material system named (melamine, laminate, spray paint, aluminium) — it's the dominant cost line
- Confirm a Suruhanjaya Tenaga-registered electrician for new circuits and a qualified installer for gas piping
- For condos, get JMB/MC approval, pay the renovation deposit, and observe permitted hours
- For landed homes, check whether a wet-kitchen extension needs a PBT permit with plans — the classic Malaysian kitchen extension does
- Confirm waterproofing if floor tiles are hacked in a wet kitchen
- Keep the deposit to 10-30% with milestone payments
Malaysian kitchen renovations trigger council (PBT) permits when extensions are involved — the popular wet-kitchen extension on landed homes is the standard case — and strata properties need JMB/MC approval. Cabinetry is priced per foot run, and electrical work must use Suruhanjaya Tenaga-registered electricians.
Budgeting first?
See the full breakdown of what drives kitchen renovation prices — job sizes, unit rates, and how to save.
Frequently asked questions
How long does a kitchen renovation take?
On-site work for a straightforward same-layout kitchen runs 2-4 weeks; layout changes with plumbing, gas, or electrical rework push it to 4-8 weeks. The hidden timeline is before day one: custom cabinetry commonly has 4-10 week manufacturing lead times, so order early and only demolish once delivery is confirmed.
What drives the cost of a kitchen renovation most?
Cabinetry — it typically consumes 30-40% of the budget, more than appliances or benchtops. After cabinets: whether you move plumbing or gas, appliance tier, benchtop material, and layout changes. A same-layout renovation with mid-range cabinets is routinely half the price of a relocated kitchen with custom joinery.
What should I check at handover of a new kitchen?
Open every door and drawer and check alignment and soft-close action; run the tap and check under-sink connections for weeps; test every appliance and outlet; check the benchtop for chips and sealant lines; confirm the splashback is sealed; and collect appliance warranties plus gas and electrical compliance certificates before releasing the final payment.
What are the most common kitchen renovation mistakes?
Ordering cabinets before finalizing appliance models; demolishing before cabinet delivery is confirmed; skimping on drawers (they beat cupboards for base storage); too few power outlets; no dedicated circuits for ovens and induction hobs; and treating ventilation as an afterthought — a recirculating hood where ducting was feasible is a permanent regret.
How much does a kitchen renovation cost in Malaysia?
Kitchen cabinet packages run roughly RM8,000-RM18,000 (about RM250-RM600 per foot run depending on materials), while full kitchen renovations typically land RM15,000-RM50,000 and premium projects RM45,000-RM100,000. Wet-kitchen extensions on landed homes add structural and permit costs on top.
What is a wet kitchen versus dry kitchen in Malaysian renovation?
Malaysian homes commonly split heavy cooking (wet kitchen, often an extension at the back) from light prep and display (dry kitchen). Renovating a dry kitchen is mostly cabinetry work; building or extending a wet kitchen involves structure, roofing, and drainage — meaning PBT-approved plans and roughly double the per-square-foot cost.
Free, no obligation. Sign in with Google to send your request.
How Handld works
- 1
Tell us what you need
Describe the job and where you are. It takes about a minute.
- 2
We match your request
Your request goes to local professionals who cover your area and service.
- 3
Compare quotes and choose
Pros reply with quotes. Compare, ask questions and hire on your terms — free for you.
Kitchen Renovation near George Town
- Kitchen Renovation in Butterworth
- Kitchen Renovation in Kampung Sungai Glugur
- Kitchen Renovation in Paya Terubong
- Kitchen Renovation in Kampung Sungai Ara
- Kitchen Renovation in Bayan Lepas
- Kitchen Renovation in Bukit Mertajam
- Kitchen Renovation in Tasek Glugor
- Kitchen Renovation in Kota Kuala Muda
- Kitchen Renovation in Val Dor
- Kitchen Renovation in Kulim
- Kitchen Renovation in Sungai Petani
- Kitchen Renovation in Pendang