Kitchen Renovation in Alor Setar
Compare local kitchen renovation / kabinet dapur pros in Alor Setar and get free quotes — no obligation, no call-backs you didn't ask for.
Typical price: MYR 8,000–MYR 100,000
Free, no obligation. Sign in with Google to send your request.
Kitchen Renovation prices in Alor Setar
| Job size | Low | Typical | High |
|---|---|---|---|
| Cabinet package New kitchen cabinets and worktop, existing layout | MYR 8,000 | MYR 12,000 | MYR 18,000 |
| Full kitchen renovation Hacking, tiling, cabinets, plumbing, and electrical | MYR 18,000 | MYR 30,000 | MYR 45,000 |
| Premium renovation / extension Wet-kitchen extension or premium custom kitchen | MYR 45,000 | MYR 70,000 | MYR 100,000 |
How to hire a kitchen renovation pro in Malaysia
- Get kitchen cabinets quoted per foot run with the material system named (melamine, laminate, spray paint, aluminium) — it's the dominant cost line
- Confirm a Suruhanjaya Tenaga-registered electrician for new circuits and a qualified installer for gas piping
- For condos, get JMB/MC approval, pay the renovation deposit, and observe permitted hours
- For landed homes, check whether a wet-kitchen extension needs a PBT permit with plans — the classic Malaysian kitchen extension does
- Confirm waterproofing if floor tiles are hacked in a wet kitchen
- Keep the deposit to 10-30% with milestone payments
Malaysian kitchen renovations trigger council (PBT) permits when extensions are involved — the popular wet-kitchen extension on landed homes is the standard case — and strata properties need JMB/MC approval. Cabinetry is priced per foot run, and electrical work must use Suruhanjaya Tenaga-registered electricians.
Budgeting first?
See the full breakdown of what drives kitchen renovation prices — job sizes, unit rates, and how to save.
Frequently asked questions
How do I compare kitchen renovation quotes in Alor Setar?
Force each quote in Alor Setar to the same structure: cabinetry (per unit or per linear metre, hardware brands named), benchtop (material, thickness, cutouts), appliances (included or excluded), trades (plumbing, gas, electrical itemized), installation labour, and old-kitchen disposal. Kitchen quotes hide differences in hardware and edge details — two 'identical' quotes can differ by a third once those are surfaced.
What drives the cost of a kitchen renovation most?
Cabinetry — it typically consumes 30-40% of the budget, more than appliances or benchtops. After cabinets: whether you move plumbing or gas, appliance tier, benchtop material, and layout changes. A same-layout renovation with mid-range cabinets is routinely half the price of a relocated kitchen with custom joinery.
Which benchtop material should I choose?
Laminate is the budget option and modern laminates are far better than their reputation. Engineered stone/quartz is the mid-to-upper standard — durable and consistent (note some countries now restrict high-silica products). Natural granite and sintered surfaces sit above it; solid timber and stainless serve specific styles. Price the benchtop with cutouts and edge profiles included, as those add meaningfully.
What are the most common kitchen renovation mistakes?
Ordering cabinets before finalizing appliance models; demolishing before cabinet delivery is confirmed; skimping on drawers (they beat cupboards for base storage); too few power outlets; no dedicated circuits for ovens and induction hobs; and treating ventilation as an afterthought — a recirculating hood where ducting was feasible is a permanent regret.
Who should I hire — a kitchen company, a general contractor, or separate trades?
Kitchen companies bundle design, cabinetry, and installation — convenient, mid-to-premium pricing, but their trades coordination varies. A general contractor suits kitchens with structural or layout changes. Buying cabinets yourself and hiring an installer plus plumber and electrician is cheapest but makes you the project manager. Match the model to how much rework your kitchen needs, not to the showroom experience.
What contingency should I hold for a kitchen renovation?
Hold 10-15% beyond the quote. The classic surprises are behind the old kitchen: degraded wiring that fails modern load requirements, corroded pipework, out-of-level floors that complicate cabinet installation, and walls that need replastering once tiles come off. Older properties justify the top of the range.
How much does a kitchen renovation cost in Malaysia?
Kitchen cabinet packages run roughly RM8,000-RM18,000 (about RM250-RM600 per foot run depending on materials), while full kitchen renovations typically land RM15,000-RM50,000 and premium projects RM45,000-RM100,000. Wet-kitchen extensions on landed homes add structural and permit costs on top.
What is a wet kitchen versus dry kitchen in Malaysian renovation?
Malaysian homes commonly split heavy cooking (wet kitchen, often an extension at the back) from light prep and display (dry kitchen). Renovating a dry kitchen is mostly cabinetry work; building or extending a wet kitchen involves structure, roofing, and drainage — meaning PBT-approved plans and roughly double the per-square-foot cost.
Free, no obligation. Sign in with Google to send your request.
How Handld works
- 1
Tell us what you need
Describe the job and where you are. It takes about a minute.
- 2
We match your request
Your request goes to local professionals who cover your area and service.
- 3
Compare quotes and choose
Pros reply with quotes. Compare, ask questions and hire on your terms — free for you.
Kitchen Renovation near Alor Setar
- Kitchen Renovation in Pendang
- Kitchen Renovation in Sungai Petani
- Kitchen Renovation in Kota Kuala Muda
- Kitchen Renovation in Tasek Glugor
- Kitchen Renovation in George Town
- Kitchen Renovation in Butterworth
- Kitchen Renovation in Paya Terubong
- Kitchen Renovation in Kampung Sungai Glugur
- Kitchen Renovation in Bukit Mertajam
- Kitchen Renovation in Kulim
- Kitchen Renovation in Kampung Sungai Ara
- Kitchen Renovation in Bayan Lepas