Kitchen Renovation in New Territories
Compare local kitchen renovation (廚房裝修) pros in New Territories and get free quotes — no obligation, no call-backs you didn't ask for.
Typical price: HK$57,500–HK$690,000
Free, no obligation. Sign in with Google to send your request.
Kitchen Renovation prices in New Territories
| Job size | Low | Typical | High |
|---|---|---|---|
| Basic renovation New cabinets and tiling in the existing layout | HK$57,500 | HK$92,000 | HK$138,000 |
| Mid-range renovation Full strip-out, custom cabinetry, new appliances | HK$115,000 | HK$172,500 | HK$253,000 |
| Designer renovation Layout change or open-kitchen conversion, premium finishes | HK$230,000 | HK$402,500 | HK$690,000 |
How to hire a kitchen renovation pro in Hong Kong
- Notify building management, pay the renovation deposit, and confirm permitted hours before booking
- Check open-kitchen plans against fire safety requirements — converting an enclosed kitchen to open layout in many buildings triggers fire service installations (sprinkler/smoke detector) and approval
- Use a registered gas contractor for town gas work (Towngas-appointed), a WSD-licensed plumber, and an EMSD registered electrical worker
- Get quotes itemized: demolition, tiling per sq ft, custom cabinetry per foot run, benchtop, and appliances
- Confirm cabinet materials handle Hong Kong humidity (moisture-resistant boards)
- Stage payments with retention until snags are fixed
Hong Kong kitchen renovations must clear building management rules, use registered gas contractors for town gas, and — for enclosed-to-open kitchen conversions — satisfy fire safety requirements that can include additional fire service installations. Structural and drainage changes fall under the Buildings Department minor works regime.
Budgeting first?
See the full breakdown of what drives kitchen renovation prices — job sizes, unit rates, and how to save.
Frequently asked questions
How long does a kitchen renovation take?
On-site work for a straightforward same-layout kitchen runs 2-4 weeks; layout changes with plumbing, gas, or electrical rework push it to 4-8 weeks. The hidden timeline is before day one: custom cabinetry commonly has 4-10 week manufacturing lead times, so order early and only demolish once delivery is confirmed.
What drives the cost of a kitchen renovation most?
Cabinetry — it typically consumes 30-40% of the budget, more than appliances or benchtops. After cabinets: whether you move plumbing or gas, appliance tier, benchtop material, and layout changes. A same-layout renovation with mid-range cabinets is routinely half the price of a relocated kitchen with custom joinery.
What should I check at handover of a new kitchen?
Open every door and drawer and check alignment and soft-close action; run the tap and check under-sink connections for weeps; test every appliance and outlet; check the benchtop for chips and sealant lines; confirm the splashback is sealed; and collect appliance warranties plus gas and electrical compliance certificates before releasing the final payment.
What are the most common kitchen renovation mistakes?
Ordering cabinets before finalizing appliance models; demolishing before cabinet delivery is confirmed; skimping on drawers (they beat cupboards for base storage); too few power outlets; no dedicated circuits for ovens and induction hobs; and treating ventilation as an afterthought — a recirculating hood where ducting was feasible is a permanent regret.
Is it worth just refacing cabinets instead of a full renovation?
If the cabinet carcasses are sound and you like the layout, replacing doors, drawer fronts, hardware, and the benchtop delivers most of the visual change for roughly a third to half the cost of a full renovation. It is not worth it when carcasses are water-damaged, the layout fails you daily, or services need rework anyway — then you'd pay twice.
What contingency should I hold for a kitchen renovation?
Hold 10-15% beyond the quote. The classic surprises are behind the old kitchen: degraded wiring that fails modern load requirements, corroded pipework, out-of-level floors that complicate cabinet installation, and walls that need replastering once tiles come off. Older properties justify the top of the range.
How much does a kitchen renovation cost in Hong Kong?
A basic kitchen renovation typically runs HK$50,000-HK$120,000, mid-range HK$100,000-HK$220,000, and designer projects HK$200,000-HK$600,000. Custom cabinetry for compact layouts plus licensed gas and electrical work dominate the bill.
Can I convert to an open kitchen in a Hong Kong flat?
Frequently yes, but it's regulated: removing the kitchen enclosure can trigger fire safety requirements (e.g., additional detectors/sprinkler provisions) and needs building management consent; some buildings and public housing types restrict it outright. Get your contractor to confirm the requirements for your specific building before designing around an island.
Free, no obligation. Sign in with Google to send your request.
How Handld works
- 1
Tell us what you need
Describe the job and where you are. It takes about a minute.
- 2
We match your request
Your request goes to local professionals who cover your area and service.
- 3
Compare quotes and choose
Pros reply with quotes. Compare, ask questions and hire on your terms — free for you.
Kitchen Renovation near New Territories
- Kitchen Renovation in Tsuen Wan
- Kitchen Renovation in Tai Po
- Kitchen Renovation in Kwai Chung
- Kitchen Renovation in Yuen Long San Hui
- Kitchen Renovation in Fanling
- Kitchen Renovation in Sha Tin
- Kitchen Renovation in Yuen Long
- Kitchen Renovation in Wong Tai Sin
- Kitchen Renovation in Sham Shui Po
- Kitchen Renovation in Tin Shui Wai
- Kitchen Renovation in Kowloon City Centre
- Kitchen Renovation in Kowloon City