Tiling in Mohammed Bin Zayed City
Compare local tiling and marble works pros in Mohammed Bin Zayed City and get free quotes — no obligation, no call-backs you didn't ask for.
Typical price: AED 740–AED 23,000
Free, no obligation. Sign in with Google to send your request.
Tiling prices in Mohammed Bin Zayed City
| Job size | Low | Typical | High |
|---|---|---|---|
| Kitchen backsplash Tile a standard backsplash, tiles excluded | AED 740 | AED 1,400 | AED 2,300 |
| Bathroom floor retile Demo and retile a bathroom floor with waterproofing | AED 2,300 | AED 4,150 | AED 7,350 |
| Full bathroom retile Demo, waterproof and retile floor plus walls | AED 7,350 | AED 12,900 | AED 23,000 |
How to hire a tiling pro in United Arab Emirates
- Use a licensed fit-out/maintenance company; obtain building or community NOC before works
- Confirm waterproofing redo for bathrooms with a water test
- For villa exteriors, confirm porcelain rated for heat and UV
- Get a per-m² written quote with demo, disposal and screed itemized
- Confirm working hours per building rules for noisy hacking
- Ask for marble/large-format experience if relevant — common in UAE finishes
Fit-out works in UAE towers and communities require management NOCs and municipality-compliant contractors; Dubai buildings typically enforce permitted hours for noisy works. Marble and large-format porcelain are mainstream, so compare quotes on identical specs.
Budgeting first?
See the full breakdown of what drives tiling prices — job sizes, unit rates, and how to save.
Frequently asked questions
What is included in a tiling quote?
Confirm five things: substrate prep (levelling, boards), waterproofing in wet areas, adhesive and grout type, cuts and trims (edge profiles), and silicone to finish. Tiles themselves are usually excluded, and removing old tiles is a separate line that can rival the laying cost.
How much does it cost to remove old tiles?
Removal is priced per square metre and depends on what's underneath: tiles on board come off fast, tiles on thick sand-cement beds are slow, noisy demolition work. Budget for substrate repairs after removal — you rarely know the wall or floor condition until tiles are off.
How long does tiling a bathroom take?
A full bathroom (floor plus walls) typically takes 3-5 days: prep and waterproofing first, then setting, then grouting after the adhesive cures. Add days if old tiles must come off or the substrate needs levelling. Rushing cure times is the classic cause of cracked grout later.
Should I buy the tiles or does the tiler supply them?
Either works, but you usually choose and buy tiles yourself and the tiler supplies adhesive, grout and trims. Order 10-15% extra for cuts and breakage (more for patterns and large formats) and keep leftovers for future repairs. Have tiles on site before the tiler starts.
Can you tile over existing tiles?
Sometimes — if the old tiles are solidly bonded and the extra height works at doors and fittings, tiling over is legitimate and avoids messy removal. It fails when old tiles are drummy (hollow-sounding) or the wall can't take the weight. A good tiler taps and checks before promising either way.
How much does tiling cost?
Tilers price labour per square metre (or square foot), with tiles, adhesive, grout and prep on top. Small-format ceramic on a flat floor is the base rate; large-format porcelain, natural stone, mosaics, herringbone patterns and wall work all cost more per unit because they are slower and less forgiving.
Why are my new tiles cracking or coming loose?
Almost always substrate or installation, not the tile: movement in the floor, missing expansion joints, adhesive coverage too thin (spot-dabbing), or tiling over a drummy layer. Cracked single tiles from impact are replaceable if you kept spares — always keep a box.
What does tiling cost in the UAE?
Labour typically runs AED 35-80 per m² for standard porcelain, more for marble and large formats. A full bathroom renovation retile with waterproofing commonly lands AED 8,000-20,000 in Dubai before tile cost.
Free, no obligation. Sign in with Google to send your request.
How Handld works
- 1
Tell us what you need
Describe the job and where you are. It takes about a minute.
- 2
We match your request
Your request goes to local professionals who cover your area and service.
- 3
Compare quotes and choose
Pros reply with quotes. Compare, ask questions and hire on your terms — free for you.
Tiling near Mohammed Bin Zayed City
Related services in Mohammed Bin Zayed City
- Flooring Installation in Mohammed Bin Zayed City
- Accountant in Mohammed Bin Zayed City
- Air Duct Cleaning in Mohammed Bin Zayed City
- Aircon Installation in Mohammed Bin Zayed City
- Aircon Servicing & Repair in Mohammed Bin Zayed City
- Appliance Repair in Mohammed Bin Zayed City
- All services in Mohammed Bin Zayed City